The Westboro Beach Pavilion Redevelopment project was constructed to enhance recreational and leisure use of the Ottawa River near the community of Westboro. The Westboro Beach Pavilion is a Recognized Federal Heritage Building because of its historical, architectural, and environmental values and a zero-carbon pavilion.
Delivered for Groupe Raymond in 2023, the single-storey pavilion required a carefully engineered roof fall protection system that respected the heritage structure, supported ongoing maintenance of a sloped steel roof, and met CSA and local safety standards, all while remaining non-intrusive to public use.
Key Challenges
- Sloped Steel Roof: Maintenance and inspection on the sloped steel roof posed significant fall hazards.
- Limited Anchor Points: The roof structure required a reliable system that could be securely attached without compromising integrity.
- Public Area: The pavilion is an active public space, so installation needed to avoid disrupting visitors.
- Weather Conditions: Rain, ice, and wind increased slip and fall risks.
- Compliance Requirements: The system had to meet CSA and local safety standards for fall protection.
Effective Solutions
- 3M Roof Anchors on Sloped Roof: Installed 3M anchors directly on the sloped steel roof to provide secure tie-off points.
- Continuous Lifeline System: Anchors connected to a continuous lifeline for full perimeter coverage.
- Safe Worker Mobility: Staff can move freely and safely across the roof while remaining tied off.
- Non-Intrusive Installation: Completed installation with minimal impact on pavilion operations.
- Durable & Weather-Resistant Equipment: Components designed to withstand seasonal weather conditions.
- Ongoing Safety Measures: Regular inspections and training ensure continued compliance and safety.