Innovative Access was retained to design, supply and install the façade access and roof anchor systems for a unique access application: the Peace Tower of Parliament’s Centre Block. Roof anchors were bolted through the existing concrete structure, giving rope access technicians secure anchorage to rappel down the tower for maintenance work.
Innovative Access also designed and coordinated the rigging plan for rope access maintenance on the Peace Tower. During the work, our team provided load testing and engineering supervision in collaboration with the project’s structural engineer.






