The 3M RoofSafe anchors were installed on a steel deck substrate. Site load testing of each anchor was performed to validate the existing structure’s integrity in conjunction with the project structural engineer. Innovative Access performed the energy analysis and fall clearance calculations for the system, along with providing the CSA-required operational drawings, log book and site inspections.




