Innovative Access Inc. was retained by the owner to collaborate with the project structural engineer for the renewal of the façade maintenance systems on this 80-metre-tall twin-tower complex.
The existing system was over 40 years old and presented access and functionality challenges. Innovative Access provided the design, custom fabrication and implementation of a new perimeter fall protection system, a total of four new roof cars that travel along the existing rail for swing stage and bosun’s chair access. New stabilization trolleys were designed to match the existing façade’s mullion guides to provide continuous platform stabilization in accordance with CSA Z271.


















